Sections C2 and C3

Client: HS2 Limited Role: Highways Design Technical Leeds Project : Sections C2 and C3 BEJJ Limited were appointed as the Highway Design Technical Leads managing and engaging the highway design teams whist coordinating with various disciplines and other consultants, as part of a Design JV during Stage 1 Scheme Design....

Tranche 5 SMP Schemes

Client: Highways England Role: Infrastructure Design Leaders Project : Tranche 5 SMP Schemes Value: M40-42: Interchange (Value £120m) & M25 J10-16 (Value £220m) BEJJ Limited were the Infrastructure Design Leaders within the Amey Arup JV, managed and coordinated between the various disciplines and other consultants during Stage 3 Preliminary Scheme...

Tranche 3 SMP Schemes

Client: Highways England Role: Technical Directors Project : Tranche 3 SMP Schemes Value: M1 J13-16: SMP (Value 373m) on M1 Costain Galliford Try JV (CGT) Site BEJJ Limited were employed within the Amey Arup JV, managed, and coordinated works between the various disciplines and other consultants during Construction Phase. Issued...

2-Storey Extension (Wolverhampton)

Client: Mr A (Wolerhampton)Role: Planning & Infrastructure DesignersProject : 2-Storey ExtensionValue: Circa. £70kBEJJ Limited undertook the design of the 2-storey extension for an existing semi-detached dwelling for our clients in Wolverhampton. We prepared the necessary planning and building regs designs and calculations which were subsequently submitted to Wolverhampton CC for...

2-Storey Extension (Dudley)

Client: Mr R (Dudley)Role: Infrastructure DesignersProject : 2-Storey ExtensionValue: Circa. £100kBEJJ Limited undertook the design of the 2-storey extension for an existing semi-detached dwelling for our clients in Dudley. We prepared the necessary building regs designs and calculations which were subsequently approved by Dudley MBC works are set to commence...

Swanswell Viaduct Refurbishment Phase 2 Schemes

Client: Coventry City Council Role: Project Managers Project : Swanswell Viaduct Value: A4053 J2-3: Phase 2 (Value 5.25m) (Balfour Beatty/Balvac Site) BEJJ Limited were engaged as the consultant Project Manager for Coventry City Council (CCC), managed, and coordinated works involving Balfour Beatty/Balvac, the Main Contractor, and Atkins the design consultants...

Sandford stadium improvements

The Sanford Stadium project consists of three main areas of improvement that will enhance the game day experience for the student-athletes. Following the Games, the area will be transformed into the mixed-use Canary District Community, a vibrant new neighbourhood that will boast market condos and townhomes, affordable rental housing, retail...